Preparing for the repair of non-structural concrete defects

There are essential steps to follow before and during the repair of relatively minor yet unsightly concrete defects. Bryan Perrie, Managing Director of The Concrete Institute (TCI), outlines what to do – and avoid – when tackling such projects:

Firstly, repairs to new concrete should be done as soon as possible after the formwork has been removed to reduce differential shrinkage and improve the bond between the original concrete and the repair material. Before doing the repair, all dust and detritus must be removed from the surface to be treated by, for example, washing vertical and near-vertical surfaces with clean water.

For manual repairs, suitable for small areas, feather edging – trying to seamlessly blend the repair material into the existing concrete – should be avoided. The outline of a repair should be cut with a masonry cutting disc or saw to ensure a square edge.

Good adhesion between the original concrete and the repair material is essential and, to ensure this, the surface of the original concrete must be strong, rough and clean. Any loose or weak material must be removed with sharp chisels, driven by relatively light hammers. But it is important to remove the unwanted concrete in such a way that the remaining concrete is not badly damaged. Sand‐blasting, which can remove small volumes of concrete, is an excellent means of achieving a rough surface free of loosely adhering material.

In cases where the repair areas are large (say over 0.1m2), and especially where persons could be injured by falling fragments, it is strongly recommended not to rely solely on adhesion between repair and background concrete but to provide mechanical fixing. Such fixing should be done with corrosion‐resistant metal devices such as screws or rods, preferably of stainless steel. Fixing devices should be installed after the surface preparation is complete but before the surface is cleaned.

To ensure strong adhesion of fresh concrete or mortar to a substrate of hardened concrete, the substrate should have enough suction to absorb the water film at the interface but should not desiccate the repair material. This limited suction can be achieved in different ways, depending on the age and density of the concrete. If the concrete is fairly new ‐ say within 48 hours of being placed – simply allowing the surface to become visibly dry should suffice. Concrete with low absorptiveness does not require pre‐wetting and should be repaired in a dry state.

The substrate should be primed with a slurry immediately before the repair material is placed. The primer slurry should be a mixture of equal volumes of cement and dry plaster sand with sufficient water to achieve a “paint consistence”. Neat cement paste is difficult to mix and is therefore not recommended. Polymer emulsion may be added to the mixing water – one part emulsion to two parts water is usually satisfactory.

Primer slurry must be applied as a thin coating to the substrate using suitable brushes. Do not allow primer to accumulate in depressions in the surface and prevent the primer to dry before applying the repair material. Priming must therefore be done immediately ahead of repairing and is best done over a small area at a time. Polymer emulsion on its own must never be used as a primer.

Older concrete should be assessed for absorptiveness by wetting the surface: if the water is rapidly absorbed, the rate of absorption would be too high; and if the water is hardly absorbed, the rate is too low. Concrete with high absorptiveness should be saturated for some hours before repairs are be carried out. Surface water must then be removed and the surface allowed to become visibly dry and repairs undertaken straight away. Remember never to attempt repairs to concrete that has a water sheen.

Good compaction is essential in concrete repairs. Semi‐dry mixes must be compacted by heavy tamping and plastic mixes applied with heavy pressure on the trowel or spatula.

Where appearance is important, repairs should be finished to match the texture of the surrounding concrete using tools such as wood floats, steel trowels, sponges, wire and nylon brushes. If colour matching is essential, it should be noted that repairs tend to be darker than the original concrete when dried out. So, white portland cement may be substituted for about a third of the grey material if such a colour match is required. The optimum substitution ratio should be determined by test: carry out a repair in an unimportant area and assess colour once the repair material has hardened and dried.

Repairs must be moist cured for at least seven days. Plastic sheeting, fixed along the edges to the concrete with pressure‐sensitive tape, is effective to trap moisture and ensure adequate curing. Good quality membrane‐forming curing compounds may also be used but remember that drying of the concrete repairs may be retarded if these curing compounds are not removed from the surface.

After completion of the curing period, polymer‐modified repairs must be allowed to dry out completely before being subjected to wet conditions. This allows the emulsion to coalesce and become water‐resistant. For more information, visit www.theconcreteinstitute.org.za or phone [email protected]